Berkeley Preparatory School
Value
$
Project Type
Education
Contract Type
Cost Plus
Project Lead
Reno Building

Highlights:
The Reno Building Team successfully renovated over 31,589 SF in 81 days at Berkeley Preparatory School. Within the seven [7] renovated building included: 27 classrooms, 5 laboratories, 13 offices, 3 workshops, and 1 digital lab.

Existing Exterior
Existing Exterior
Aerial - Red outlines building location
Aerial - Red outlines building location
Existing Exterior photo
Existing Exterior photo
Existing Exterior photo
Existing Exterior photo
Existing Exterior photo
Existing Exterior photo

Administration Building Renovation

Berkeley Preparatory School
Value
$
Project Type
Education
Contract Type
Cost Plus
Project Lead
Reno Building

Highlights:
A 40,000 SF interior renovation of an existing Administration Building. The work will include new offices, book store, classrooms, library upgrades, new VRF air conditioning system, LED lighting, millwork, bathrooms, etc. This project is scheduled for completion in the 4th quarter of 2017.

Student Drop-Off

Berkeley Preparatory School
Value
$1MM
Project Type
New Construction | Renovation
Contract Type
Project Lead
Reno Building

Highlights:
Demolition of an existing student drop off and install a new one.

Before photo
Before photo
Before photo
Before photo

Student Services Building Exterior Renovation

Hillsborough Community College
Value
$670,000
Project Type
Exterior Renovation
Contract Type
Lump Sum (Hard Bid)
Project Lead

Highlights:
This project consists on an exterior renovation of an existing building. Removing a brick veneer system and replacing with a new stucco system. There is also new cast stone panels, water tables, and sills.

Final Exterior Photo
Final Exterior Photo
Cafeteria
Cafeteria
Final Exterior Photo
Final Exterior Photo
Admin Interior Photo
Admin Interior Photo
Lounge
Lounge
Kitchen
Kitchen
Media
Media
Classroom
Classroom
Classroom
Classroom
Classroom
Classroom
Aerial photo
Aerial photo

Summerfield Crossings Elementary School

Hillsborough County Public Schools
Value
$11,000,000
Project Type
New Construction
Contract Type
CM at Risk (GMP)
Project Lead
David Reno | PM Mathews

Highlights:
New school, 15 acre site, six buildings, 3 two-stories, 3 single-story, HVAC chill water system, tiltwall construction

NE vestibule entrance
NE vestibule entrance
Gymnasium
Gymnasium
Mosaic tile
Mosaic tile
Interior view
Interior view
Curtain walls
Curtain walls
Hydro therapy room
Hydro therapy room
Aerial view
Aerial view

Field House

Berkeley Preparatory School
Value
$7,000,000
Project Type
New Construction
Contract Type
CM at Risk (GMP)
Project Lead
Reno Building | Consultant

Highlights:
New 56,000sqft two story masonry structure with a gymnasium, locker rooms, fitness rooms, classrooms, aerobics, alumni center, etc.

After photo
After photo
Progress photo
Progress photo
Before photo
Before photo
Progress photo
Progress photo

Berkeley Prep - Site Development

Berkeley Preparatory School
Value
$6,200,000
Project Type
Site Development
Contract Type
CM at Risk (GMP)
Project Lead
David Reno | PM Mathews

Highlights:
80-acre development, two bridges, three ball fields, one soccer field, new sports lighting, etc.

Aerial photo
Aerial photo
Exterior view
Exterior view
Walkway
Walkway
Decorative column
Decorative column

Berkeley Prep - Covered Walkways

Berkeley Preparatory School
Value
$500,000
Project Type
New Construction
Contract Type
CM at Risk (GMP)
Project Lead
Reno Building | Consultant

Highlights:
New open-air structure with barrel tile roof system, architectural column wraps, hardie board ceilings

Clock tower
Clock tower
Clock tower close up
Clock tower close up
Clock
Clock

Berkeley Prep - Clock Tower

Berkeley Preparatory School
Value
$150,000
Project Type
New Construction
Contract Type
CM at Risk (GMP)
Project Lead
Reno Building | Consultant

Highlights:
New clock tower with a Verdin clock, masonry structure with stucco exterior and barrel tile roofing system.

Final photo
Final photo
Final photo
Final photo
Final photo
Final photo
Aerial photo
Aerial photo

Tarpon Springs Elementary School

Pinellas County Schools
Value
$3,000,000
Project Type
New Construction
Contract Type
CM at Risk (GMP)
Project Lead
David Reno | PE Mathews

Highlights:
32,000 sqft, single story, pre-engineered metal building, split face block in-fill, active campus

Interior View
Interior View

Auditorium Renovation

South Florida Community College
Value
$11,000,000
Project Type
Renovation
Contract Type
CM at Risk (GMP)
Project Lead
Randy Hilgeman | PM Mathews

Highlights:
Complete interior/exterior renovation, foundation adjustments with helical piles, fly loft 25’ height increase, new upper and lower lobbies, new upper balcony and side boxes, traction elevators, etc.

Aerial photo
Aerial photo
Overall campus aerial photo
Overall campus aerial photo

Beth Shields Middle School - CFK Addition

Hillsborough County Public Schools
Value
$2,300,000
Project Type
New Construction - Addition
Contract Type
CM at Risk (GMP)
Project Lead
David Reno | PM Mathews

Highlights:
EHPA hurricane shelter, CMU walls with hollowcore plank, active campus

Aerial photo
Aerial photo
Overall campus aerial photo
Overall campus aerial photo

Cypress Creek Elementary - CFK Addition

Hillsborough County Public Schools
Value
$2,300,000
Project Type
New Construction - Addition
Contract Type
CM at Risk (GMP)
Project Lead
David Reno | PM Mathews

Highlights:
EHPA hurricane shelter, CMU walls with hollowcore plank, active campus

After photo
After photo
Before photo
Before photo

Cypress Creek Elementary - Re-Roofing Project

Hillsborough County Public Schools
Value
$1,200,000
Project Type
Re-Roofing
Contract Type
CM at Risk (GMP)
Project Lead
David Reno | PM Mathews

Highlights:
Completed a 32,000 (+/-) sqft roofing renovation project; which included removing the entire existing roofing system and installing a new 3-ply roofing system.

NE exterior view
NE exterior view
West exterior view
West exterior view
Interior corridor
Interior corridor
Final photo - east view
Final photo - east view
North view
North view

Child Development Center

Hillsborough Community College
Value
$3,500,000
Project Type
Historical Renovation
Contract Type
CM at Risk (GMP)
Project Lead
David Reno | PE Peter Brown

Highlights:
Historical renovation, dance studio, daycare, porte cochere, etc.

Aerial photo
Aerial photo
Aerial photo
Aerial photo
Aerial photo
Aerial photo
Aerial photo
Aerial photo

Eisenhower Middle School - CFK Addition

Hillsborough County Public Schools
Value
$1,800,000
Project Type
New Construction - Addition
Contract Type
CM at Risk (GMP)
Project Lead
David Reno | PM Mathews

Highlights:
Located in the center of an active campus, chill water system, single story

Aerial view
Aerial view
Aerial view
Aerial view
Overall campus aerial view
Overall campus aerial view
Overall campus aerial view
Overall campus aerial view

Corr Elementary School - CFK Addition

Hillsborough County Public Schools
Value
$2,000,000
Project Type
New Construction - Addition
Contract Type
CM at Risk (GMP)
Project Lead
David Reno | PM Mathews

Highlights:
A 16 classroom, EHPA hurricane enhanced building, with a new chill water system on an active campus.