Berkeley Prep Administration Building Renovation

Berkeley Preparatory School
Highlights: A 40,000 +/- SF, 2-story, renovation of an existing Administration Building in the heart of Berkeley's campus. This building is the hub for the entire campuses technology infrastructure; which had to continue to operate throughout construction. The work consisted of a complete renovation and transforming of this building to a state of the art Administration Building along with a library, book store and classrooms. A new variable refrigerant flow [VRF] system was installed that exceeds a 21 SEER rating; which allows this building to be energy efficient.

Berkeley Prep Repurpose Project

Berkeley Preparatory School
Highlights: The Reno Building Team successfully renovated over 31,589 SF in 81 days at Berkeley Preparatory School. Within the seven [7] renovated building included: 27 classrooms, 5 laboratories, 13 offices, 3 workshops, and 1 digital lab.

Prince of Peace - Education Building

PRINCE OF PEACE LUTHERAN CHURCH
Highlights: 5,000 SF building with seven classrooms, two offices, six restrooms, and multiple storage closets while built on an active campus with temporary access control. Existing parking lots upgraded with new islands, trees, irrigation systems, etc.

Student Services Building
Exterior Renovation

HILLSBOROUGH COMMUNITY COLLEGE
Highlights: Exterior renovation of an existing building included removing a brick veneer system and replacing with a new stucco system, as well as new cast stone panels, water tables, and sills.

Cypress Creek Elementary - CFK Addition

HILLSBOROUGH COUNTY PUBLIC SCHOOLS
Highlights: EHPA hurricane shelter and CMU walls with hollowcore plank on an active campus.

Corr Elementary School - CFK Addition

HILLSBOROUGH COUNTY PUBLIC SCHOOLS
Highlights: A 16 classroom, EHPA hurricane enhanced building, with a new chill water system on an active campus. [David Reno as PM]

Cypress Creek Elementary - Re-Roofing Project

HILLSBOROUGH COUNTY PUBLIC SCHOOLS
Highlights: Completed a 32,000 (+/-) SF roofing renovation project, which included removing the entire existing roofing system and installing a new three-ply roofing system. [David Reno as PM]

Child Development Center

HILLSBOROUGH COMMUNITY COLLEGE
Highlights: Historical renovation, dance studio, daycare, porte cochere, etc. [David Reno as PM]

Eisenhower Middle School - CFK Addition

HILLSBOROUGH COUNTY PUBLIC SCHOOLS
Highlights: Located in the center of an active campus, chill water system and single story. [David Reno as PM]

Summerfield Crossings
Elementary School

Hillsborough County Public Schools
Highlights: New school, 15 acre site, six buildings, 3 two-stories, 3 single-story, HVAC chill water system, tiltwall construction [David Reno as PM]

Beth Shields Middle School - CFK Addition

HILLSBOROUGH COUNTY PUBLIC SCHOOLS
Highlights: EHPA hurricane shelter and CMU walls with hollowcore plank on an active campus. [David Reno as PM]

Auditorium Renovation

SOUTH FLORIDA COMMUNITY COLLEGE
Highlights: Complete interior/exterior renovation, foundation adjustments with helical piles, fly loft 25’ height increase, new upper and lower lobbies, new upper balcony and side boxes, traction elevators, etc. [Randy Hilgeman as PM]

Tarpon Springs Elementary School

PINELLAS COUNTY SCHOOLS
Highlights: 32,000 SF, single story, pre-engineered metal building, split face block in-fill on an active campus. [David Reno as PE]

Field House

BERKELEY PREPARATORY SCHOOL
Highlights: New 56,000 SF two-story masonry structure with a gymnasium, locker rooms, fitness rooms, classrooms, aerobics, alumni center, etc. [Reno Building as consultant, PM services]